It is meant to determine The goal of improving the quality of the supplier must have a level B to level A at 97% and aims to control the parts that do not meet the DWG given Defective ratio at 10 ppm, and in parts of engines and tractors. It must be in the 3.4 ppm level, focusing on the parts of such claims. The piece was about the safety and efficiency of the engine.
การแปล กรุณารอสักครู่..
