Khlong tha ngio reservoir project. Moo 1, Tambon tha ngio Opera home port district, Trang province.The initiative: His Majesty King Bhumibol AdulyadejThe history of the project: Tambon tha ngio sideline. Tambon Nong Chang, Huai-Nang has sailed and the book of honour created a reservoir and water delivery systems. When the subsequent September 25 ratlekhathikan Office has 2532 books scroll, 5,000/3231 chaengkrom 2533 March 2 that shelters the down has taken when communicate Please note official King, then please, get reservoir projects tha ngio Canal project is on hold due to the initiative.The location of the project: The head of the dam the Canal, THA ngio. Located on a canal, THA ngio In the district, Tambon Khlong tha ngio district, Trang province. Construction period of 7 years (2537 – 2543) 18.50 million cubic metres capacity.The purpose of the project: 1. to use as a source of water catchment areas, valleys, waterfalls, glass stone above the yard stage Kuan. For a water source is the cost to agriculture. An area of approximately 12,700 acres dry season and drought in the rainy season or within range of disposable rain season cultivated Plains Tambon tha ngio. Tambon Nong Chang, Huai-Nang, and sailing can be entrepreneurial agriculture has continued throughout the season of planting. 2. to use as a source of water for sanitary purposes – in the dry season or during the parliamentary experience problems suffered due to a lack of water about 22 villages in 3, above, and the nearby subdistrict, can help. 3. to as a sideline that has benefitted from the project better by supporting water resources, which are the basic factors of the yield of agricultural, agriculture, industry, tourism, etc. 4. to increase the richness of the forests upstream by the water in the reservoirs, underground water levels upstream forestry area retain skin moisture of natural forest resources. 5. in order to supply water to the soil for future district's plumbing.The performance of the project: Irrigation Department has conducted a detailed study and survey design, project construction of canals, reservoirs and water delivery systems, including Opera posture, length approximately 13.10 km completed, b.e. 2543 by ridges reservoir.The dam width 8 m long, 330 meters high and 40 meters of water can be entrapped 18.50 million cubic meters.The benefits of the project: 1. How can water help farmland in some areas, Tambon tha ngio. Tambon Nong Chang, Huai-Nang and tambon sailing nearby Plains downstream of reservoirs, canals, water shortages in times of Opera posture or a rain delay of about 12,700 acres irrigation area and help to cultivate crops in the dry season, approximately 5,600 acres. 2. can the nanoparticles to the consumer – the consumption of the people, who live nearby, are about 10 villages in the above 3 t. 3. can add plenty of forest trees by the water volume in the reservoir can raise the underground water areas, forests, water resources, forests, natural moisture.
การแปล กรุณารอสักครู่..
