Study on the special problems raised by this issue are intended to increase the efficiency of work processes by phapkrasae plan. (VSM) of company securities company case studies for the open information, and ways to determine the cause of the problems that arise in the process of work. The process unnecessary work and costs of each process a wide range of studies the map to know the factors, fishbone could result in problems when know everything that is causing the problem as much as possible, it is write phapkrasae plan nutrition (VSM) to be aware of the problem in each process and.Edit by using the method of analysis of the losses due to the wait. Analysis of loss due to the motion and bring the information to write the new value to phapkrasae plan modified. (VSM) and compared to the original phapkrasae value plan (VSM) after comparing it with an analysis of working time and productivity each day. The study found that in the process of working that do not need to be met in the process as part of a packaging step to landing without landing it is not necessary for the procedure to take the time to do all the work fixing 149.23 minutes after processing check box.Rakaekhai activity in a portion of the relocation is not required, using the time to work all the minute 130.46 down to all later revisions and 18.78% 12.58 minutes or all 4 processes, process, or 28.57% for the production of goods, it can produce has risen 74 pieces per day or 13.56%
การแปล กรุณารอสักครู่..
