The area of the mouth of the pond hole will create a barrier to protect the concrete country water runoff from the concrete base to flow into the pond near the mouth of the hole. This is. Water runoff ponds area near the mouth of the hole may be contaminated with crude oil. Therefore, the project will make the runoff water pumping it into a separate status in order to separate crude oil out of the water, where the water has been extracted is stored in a water tank from the production process. To return to the compressor compressor water back to the hole. In addition, the execution of the project will provide employees perform monitoring on a regular basis in order to observe the water level inside the tank, and if water volume are found in ponds, 70 percent will continue to pump the flood into a separate State. Surface runoff water quantity area, all holes near the mouth of the pond equal to 3.28 cubic meters per day.
การแปล กรุณารอสักครู่..
