AbstractThis project is to simulate the system accumulates energy by ultra power capacitor. Using MATLAB engine to reduce peak power demand in industrial plants. In order to reduce electricity in parts of the power Max. The samples analyzed As the statistics of the average industrial factory loads in one week per plant. In April of the 2557 (2014) MEA leading brand electrical capacitor that MAXWELL 2.7 V, 510g., experimental 3600F showed accumulated energy system by ultra power capacitor. It can reduce the maximum power values for power plants that pay load, and when they increase the amount of power capacitor will increasingly be able to make up the maximum power requirements. Is reduced to a value? The maximum power requirement values will not change.This project is to simulate the system accumulates energy by the battery. In order to study. The ability to reduce peak electricity demand by using the MATLAB program samples that were analyzed. As the statistics of the average industrial factory loads in one week per plant. In April of the 2557 (2014) MEA leading brand electrical capacitor that MAXWELL 2.7 V, system model 510g, 3600F. power values and the power of a power capacitor is calculated using an equation model in the form of an objective function. Results of analysis showed that the load was analyzed in 1 day per 1 plant with the highest electrical demand 280 kW when using electrical capacitor of 1 series can reduce the maximum electricity demand was low and 1 279 kW kW when using electrical capacitor number 10 sets the maximum electricity demand dropped 9 kW rest 271 kW.
การแปล กรุณารอสักครู่..
