Project management has improved the order by order, according to the latest located at 3 / 2010 am. 30 July 2010
in 2002. Now, the start of construction. That Dr. flood วิภาช Prasit is the beginning of the year๒๕๔๒ construction factorial design and Peter. 4. To help drainage flood year.In August 2000, construction units divide freshwater area - brine. In order to eliminate the conflict of the people in the area nearby, but the water quality requirements inconsistent with the construction of sea water irrigation system in coastal areas. There.Construction of irrigation and freshwater. Department hosted in driving the development. The construction was completed in 2004, the main infrastructureIt was conducted more in continuous space by the sequence.