From the cooperative education into practice. In Gulf Power Generation Co., Ltd., was assigned to work in the maintenance department. Engineering Division The department is extremely important to the maintenance of machinery for the production of electricity
in the operations there. The project is divided into two parts, the first is to design Orifice plate for the high-pressure water into the boiler. By studying the principles of the boilers in thermal power plants. And to study the works of Orifice plate of various kinds. And designed Orifice plate by modeling the flow of water at high pressure through Orifice plate then analyzed by program Solidworks Flow Simulation 2013, and then perform Orifice plate that suits the user. Most
of the above will result in the damage of tube Orifice plate on the back. And reduces the cost of maintenance, with
the second part is the preparation of the water balance of the Kaeng Khoi 2 power plant. Using the information gathered from various sources. Kaeng Khoi 2 power plant which has been approved by the Department of Irrigation to 10 can use the river water for up to 54,400 cubic meters / day. And sewage from the plant up to 10,000 cubic meters / day
of preparation of the water balance is for sure. Water that enters the plant was put into use in some activity. Water the plant out to the channel does. And water - from the factory with an equal amount or not.
การแปล กรุณารอสักครู่..