Mold Maintenance is not. Due to multiple Shots are performed with fins.The piece is to trim the fins are not reached.The piece has a fin. In-process inspection is not enough and strong.The process of monitoring is not sufficient.Because the pieces are trimmed, so the chance to work out of this.There is a pile of pieces of work during, and make a dress that doesn't pass is dropped into the box.There are no strong checks because of the confused, the trim and the trim of no.The piece is a plastic bag holders, make a check does not clear.F/G checked randomly did not detect a fin.There are no controls on the number of Shots made the mould Maintenance.High pressure injection molding received.The piece has a fin.Born out of the skin, fins, PL in Holding spray.Born in fin surface PL Holding sprayThe surface is not completely PL.
การแปล กรุณารอสักครู่..