The flood continued after Ayutthaya Irrigation Department, letting the water impact 6 last district. Some high points 2 meters.You. His white mice, head office of disaster prevention and mitigation province () (AOT) Ayutthaya, told the news agency of I. N. N.. The current situation that the water to overflow the well into the flood basin low outside the water barrier of flap area 6 District consists of Sena District, phak Hai,. Some government, province, bang pa-in and bang Sai still condition stable, measure the peak level of the water 2 meters. Impact of villagers with traffic greatly. However, in the historical places or temple. Currently, many agencies set up a perimeter to solve a problem. The cause of the flood irrigation water from the dam from the drop in flow rate, 1 790 cubic meters per second. Considered higher than the point of the province will be in low level, 800 cubic meters per second to 990 cubic meters per second. Make the river riverbank suffered.However, couldn"t identify. Water is reduced until the return to normal when It depends on the management of the Irrigation Department. However, not released in the more. As soon as the reduction of emissions of water left lower rate 800 cubic meters per second, the water is dry, of course.However, the head of a commission Ayutthaya admit past the Department to alert level to release water to villagers watch handle frame shorter period of time. Therefore, many of the defense team behind.
การแปล กรุณารอสักครู่..
