Updated sieve drain around the building (area of 550 m) road traffic lines painted buildings
ground floor and 2 floors parking slot B breaks. In the best residential
rooftop waterproofing work/52 floor terrace repair building structure cracks
.System to pass through-out the best residential (Condo)
install the CO2 fire extinguisher 10 lb size type, install an electric charge in the middle class. A number of leading 48
improve lighting to illuminate the building (LED)
CCTV-closed circuit television system adjustment (DVR, System cabling)
updated front and pour cement. In front of the school building roof installed in front of the school building
.
การแปล กรุณารอสักครู่..
