1. The inspectors found the defects, so they reduced the speed from 30m per minute to 10m per minute, inspected them separately and informed their superiors.<br>2. The supervisor has informed the quality team.<br>3. The quality team consulted GM production, because it is express cloth, so it decided to check the speed according to the standard factory 30 meters per minute and cut and release it.
การแปล กรุณารอสักครู่..