1. Ceiling mounted ceiling frame can not be carried out, and the ceiling panels Real T-BAR wait because the IRPC. Check the wall top and systems. No top-
examination and IRPC. Check the walls and there is no monitoring system is waiting for the fire system installation, operation and installation of pipes and then
poured on the pressure, and there is no pending cracks of walls and structures.
การแปล กรุณารอสักครู่..