2. the # 1 Mixed Bed system, 2 the problem valve leakage, chemical make up to an abnormal result quantity regen chemical deposition and resin Mixed Bed # 1, which after low-resistivity values up and regen resulted in water quantity in the system I D, problem solving approach to change the valve set to restore the system, Mixed Bed before storing data in order to compare the performance again.3. a KPI values higher, since the month of July-August (1.48-1.55), causing the expected result from the manufacturing process that uses more water per volume are and lose steam left in the system, the team solution Process to do a study on how to reduce the Star Kier, turn the steam vent valves.