As possible into the analysis made in order to find the problem that caused most of these flaws. The information provided on each of the issues that arise for finding fault percentage and cumulative percentage qualifying for significant problems.1.4 team preparation related to the problem of Security is a system of systems, System 3 Module system, link Manager, and system Module Card Interchange Dispute Module, divided into 3 groups of works by testing the old system and to test the Six Sigma resort Jomtien beach Pattaya hotel. The test team used the same series.
การแปล กรุณารอสักครู่..
