What is the evaluation assessment will be divided into 2 categories:1. evaluation of design effectiveness (Evaluation of Design Effectiveness) 2. evaluate the operating effectiveness (Evaluation of Operating Effectiveness) -To evaluate those estimates (which have been appointed by the company) shall make the forms used in the assessment, which is called a "Check List" is a list of risk and control that is written in the RCM in Roussillon MAS to sow. each section of the control. To specify the items to be evaluated, in order to facilitate assessment and summary document with assessment."Check List" consists of the RCM of Evaluation of Design, Evaluation, Re-Evaluation, Operating (Roll-Forward) RCMDesignOperationRe-evaluation (Roll Forward) Design :-Evaluation of the effectiveness of design is that those measures to check the page to see the actual operational details and request sample document 1 set check to see whether there is a direct action, as written in the document, an internal control system (J-SOX) and collect the evidence documents as evidence. If checked, then meet them one at a time in the document, it will be summarized as "OK" but if not, it will be summarized as "NG", or that it has not yet happened, events concluded as "WIP" If "NG", it needs to be revised is the correct way to do actual work, or editing a document, they want to see, but the suitability and accuracy of each event. The evaluation assessed in every control. Topics in assessment in each control will vary depending on the control, but a summary in the top will be summarized in the overview. If it is stuck "NG" in some of the topics in the overview will show as "NG" is the same both in the Design, Operation and Re-evaluation (Roll-forward) "OK", "NG","WIP"DesignSpecify the details which will assess. Operation :-Evaluation of the effectiveness of the operation is that those estimates to examine documents, samples (sample documents are documents that a worker has already made in the past from time to time. Randomly selects a document from time to time make measurements) to determine whether a random sample check-in a document has been prepared, with texts, with approval, there was no direct documentation, as written in an internal control system documents (J-SOX) and collect the evidence document. "As the evidence. If checked, then meet them one at a time in the document, it will be summarized as "OK" but if not, it will be summarized as "NG", or that it has not yet happened, events concluded as "WIP" If "NG", it needs to be revised is the correct way to do actual work, or editing a document, they want to see, but the suitability and accuracy of each event. "OK", "NG", "WIP"OperationSpecify the details which will assess. Re-evaluation (Roll forward) :-Repeated assessment is that those estimates into measures for items that do not pass or "NG" in the assessment for the first time, it will make the same assessment, but will focus on specific measures in the point in the first place. OperationMeasurement details like in the first place."OK", "NG", "WIP" For the measurement procedure, this will just end. Summary of the evaluation is to examine the running of each Process on each point, as written, since at first only. As mentioned in the first episode that the team must examine internal control document (J-SOX) to match the actual performance will be assessed through cleanly. For the following sectors will be discussed and a summary assessment report?. Thanks dude 6 Feb 2009.
การแปล กรุณารอสักครู่..
