Khun CARRIE CEO
a project that will require the HLG-150H-48A = 300 pcs for Highbay 2
project divided by the project's plant Tepthai = 100 pcs now
fixtures are examples. To conclude about In mid-July 2 project
Tapthai another 2 200 pcs will conclude in early August. From the first project, which is
the first project no mistake, it is through these two projects and is also
recommended by an adult, so I think that there should be no problem. Just be installed to see
the engineer saw the empty project if everything runs through the driver may
have to switch to version ELG-150-48A, instead, to reduce the cost of production. more
the new project that will be presented at the Company's subsidiary, AGC. Also in
the process of discussing the specification and price. If the price is likely to amount of use is
about 120 light inside the building. Exterior have not talked
การแปล กรุณารอสักครู่..
