Because of this, the civil court issued a warrant for the defendant to prove that the cracks are caused by a defect in the manufacture or design of the defendant or not. At the meeting with Top HMST HMMT Mgr for the 13-3-2015, concluded that the paperwork, the Court will have to conclude a formal request, but during the litigation. Repeating events should not be required until the coming prosecution. There are New and better Frame control and checking it. Hotel รอัฐ ya think if TKT did not understand the meeting better ranat's pass will be up to the Board as evidence that the manufacturer of TKT is executed it with the problem here.
การแปล กรุณารอสักครู่..