1. Want to hit the stairs and storage. And shut the door between the store with buildings. 2
2. Partition glass and next to the door to make room for picking the materials, equipment, Fast Moving
3.Installation Scan Bar code to staff picking device manually as. Shopping
4. The budget in the use of approximately. 200 000)
5. Add, rack nut to make sufficient to store
Project: Store Fast moving.
การแปล กรุณารอสักครู่..
