In order to make the flow of water during the rainy season, like the state before the project
.In addition, Installed Culvert must have the consent of the owner on either side of the street, by the project proceed do construction route.It is expected that the impact of road construction, the base pit production of the project will be in the low level.
การแปล กรุณารอสักครู่..
