From the results, try it cause know one day with 80 minutes in which we work.Java time, try GE Not enough brake line production based. Which is not the same as actually measured in the brake cable production.
The results of the simulations paint production line, the first time that day with 80 minutes of work we require for simulation. Not enough to produce brake hose at the amount the customer wants. Unlike the true measure of manufacturing brake lines.
The effects of JAL two production lines, to know that the time 1 days with 80 minutes in the work to us.Define for JAL. Not enough to produce brake plate that according to customer needs. Unlike the true in the production of the brakes.