Turn the machine on the outside of the control switch (switch control size), are in the category with the release of tension, drops the machine pulley vertically up to a defined level. Check wiring according to ROK, according to the different wheel sets (tension) tension adjust meter meters. (Mater set) when you are ready, open the transmitter beam.
การแปล กรุณารอสักครู่..
