Through the project, so do not have a tank that serves big enough to accommodate the silt soil caused by the water in the pipe business from Central pipes by means of static tests.
The project was not carried out to provide a magnetic proximity of sufficient size to accommodate the sediments formed by water stays in the pipes from the test tube by means of hydraulic static.
The project did not proceed to provide tank support are of a sufficient size to accommodate the sediment incurred from the rest water in the pipes from the test tube method, static water