Examine and tighten when activation:
no hair, when offered a detailed investigation. Reinforcing steel to อนม
consciousness before pouring concrete. All parts before operation
.
the reinforced concrete structures:Changes in steel happened
.
carried on without offering details
calculation list and has been made from changes, with the signing in hired from the contract engineer. Of the company will make โจ่ Co., กดั
.Check the photos back of company will make โจ่ Co., press
and photos of the company will make โจ่ Co., กด
to, project owner
found that the hair. When working the structure, foundation, ground improvement, the system structure, the stanchion, พืนThe structure, is not to
conventional and changes the reinforcement ขนึ
.
carried on without offering details, calculation list and has been made to
.The change from a contract signed in hired from engineer of company will make โจ่ Co., press
- 2548 check of foundation work, failure characteristics of หลม
.
found swimming bent sub in root level noise, test pick led times of collision, the soil (Bearing Capacity
.Test) no offer and อนม
the hair. When the operation
- 2548, reinforcement is not to follow the way of engineering design. Changes in steel happened
proceed without
, offering detailsCalculation list, and has made the change from a contract signed in employed by engineers of the company will make โจ่ Co., กดั
.
การแปล กรุณารอสักครู่..
