Prepared for use in the contractors for construction (Submission Drawing) to the employer the submission to the government offices involved. :
2.3.5.1 and related documents to the buyer to use in the submission construction, supply of qualified engineers to signed in May. Section 39 bis
2.3.5.The 2 contract coordination with various consultant of project, including architects, engineers ทุกระบบ system related to the preparation of engineering drawings for use in the application for construction. (Submission Drawing)
2.3.6 doing construction (CONSTRUCTION DRAWING)
2.3.6.1. The contractor was prepared for use in construction, as follows: a structural model
plants in AutoCAD
international structural engineering model in the form Revit. (LOD350)
international list of composite construction
2.3.6.2 contractors, to deliver a written application with Revit 2015 resolution LOD 350 and convert files and the AutoCAD Sketch Up buyer check work
2.3.6 river.3 consultation with employer. To adapt to the construction cost in the budget set the update materials and BOQ to complete.
การแปล กรุณารอสักครู่..
