Dear Naruenatpaisan results inspect the construction solved as follows. 1. Frame was drilled and inlaid with wood plugs. Mounting screw on each side, 3 technicians do not use Bolt anchored by Sketch at them. 2. match - fixing screws. Not match the position of the cleat walls are made of wood embedded. 3. Head screws, wood covered with thick 1cm. Wide 4cm. Closed guard as the height of the sash and frame on. 4 all the outstanding color finish. Keep the plaster walls , wood carver, I was introduced to cover the jamb liner out for sure. There is a gap between the door frame with the N pole or wall. If there are gaps, to stick to the pre-drilled frame for embedded anchors, wood and photography before - after filling. , add a screw on each side 6 Door stop should be installed back again to force the door open 90 degrees. or setting the Shock to Shock the door opened by one of the above is not applicable to rubber wedge. In the groove
การแปล กรุณารอสักครู่..