The control store
control Store will start when the material, tools and equipment shipped to the construction department. The process will start receiving, storage, control, bill of material balance disbursement และรับคืน.
.The key of controlling Store is control of materials into and out of the warehouse. The pass control inventory (Stock Card), including the control of incoming and disbursement of the material, which Storekeeper must give primacy. The duty ofIn general, functions, duties of Storekeeper construction expect is
.- supply of machinery, tools and equipment that meet the needs of users!- receipt parcel (materials, tools and equipment, including machine for construction). The ship arrived at construction sites that accurately match the items ordered
.- store in place, right and proper. To reduce the loss or damage from the filing incorrect
.- disbursement, care and storage equipment, materials in the state is ready to use. The damage must be repaired immediately
.- ensure that the tools and equipment users picking out. Use correctly the type of tool that
- report and material balance report every month!- you know the type of materials, tools, equipment, machinery and use reasonably
.
การแปล กรุณารอสักครู่..