2) map showing water development project and network transport in an overview of the Eastern basin (as shown in Figure 5.1-1), which is developing a new industrial estate. If you are near the water source development project, regardless of whether it is a reservoir or water transfer pipe system increases stability on the water cost, however, with the requirements of environmental impact reports. Keep the newly developed industrial estate would require development of catchment pond for storing rainfall that fell within the area of industrial estates are not to affect the outer space can take advantage of the improved water storage pond as a water source for the costs in connection with the diversion of water from the river branches do not take distance from water source development projects considered. In the fields of water resources cost
การแปล กรุณารอสักครู่..