The problems that we encountered in the preparation of the 7 weeks during the gala dinner, it can be divided into three issues is the problem of the head of decoration, The problem of the head in the team and the problem of what's used in decoration.The problem of the head of the decoration is the difficulty in designing a gala dinner to match the theme that is assigned, and must not exceed the capabilities of a child theme is difficult to follow the map, budget control. Time of distribution to a child theme child themes, arranging and tongborihan work to run the work on this all the time. We have to head meetings. All weeks to track the progress of work decoration.The second problem section. The problem of the team is that each team has the ball and the idea. Make the ball each team must rely on teamwork to pass this barrier will have to be.The last problem is the problem of part of that used in decoration. That something is done. Something is what you want to find. Therefore, the making of that coming up. Maybe it's difficult for some people to be extra thokong and maybe take some time to do so by the sap work schedule, adidas, of course, and in the best of people to buy things of it, even though it is difficult to see, but it is to be raised to meet the demand.
การแปล กรุณารอสักครู่..