Water turbine mechanical Development Center fill the air-water surface buoy floating slowly rotate
His Majesty's care about the plight of the suffering caused by this is the king that seeth wastewater condition in the area of many many times, in the Bangkok metropolitan area metropolitan area and the provincesInitially during the year B.E. 2527 - 2530 he recommended for use with water and Waste Water Quality can help to alleviate the filter wastewater plant with water hyacinth and water, which can help solve the problem in the water level of the Royal turbine
later in the year.2531, for example, the condition of the water, there are perishable rate trend toward more intense use of natural way may not alleviate the perishables. Water as effectively as it should.It can be produced in the country, which has a "Thai Thai "guidelines, he is from the "Got to" which is a video device into water, which is a folk wisdom devised a preliminary point
This Be it, therefore, enacted by the Chaipattana Foundation, budgetary support to the education and research new inventions are created by this tool with the Department of Irrigation wastewater treatmentAnd most widely known throughout the country at present is "Water turbine Development Center"
when the royal December 24 , 2531 His Majesty the King and the Royal's wastewater problems by filling oxygen in water are summarized as follows:
Fill the air with waste water into 2 ways one way to use compressed air to blow through the pipe into a distribution below the surface foam and another way would be done by a windmill Video Video water lap up to the surface, and then let it fall back to the surface.With the power of a small electric motor is not more than 2 horse power flow of water or may be used, and therefore should be considered a prototype, and then try to install waste water treatment in the hospital area and the king glorious temple house temple
The study, research and development
The Royal Irrigation Department is to respond to the study and to create derivative works without the prototype power water pumping the water from the "turbine water pumping the water buoy float" change to "Water turbine Development Center".When May 1 , 2532 and the glorious temple house temple when May 3 , 2532 to study, research and development waste water treatment system for a period 4 - 5 years
การแปล กรุณารอสักครู่..
