To develop water resources. Study development of water resources, water supply work is supporting the study and development of the Huai Hong Krai Center, especially the development of headwater areas. Have tried to take advantage of the water that flows down from the Summit. Down to the bottom, maximum benefit by Weir upstream (Check Dam) for water intended to maintain the moisture of the ground during the dry season, and made the system explode out of the chevrons to increase moisture in the soil for reforestation and forest fire protection concept for wet (Wet Fire Break), the water flowing beneath it to do a reservoir on and exploit the basin water born activities to cultivate support. Animal husbandry. Fisheries, which are summarized as follows:1.1 the task links between small watershed as a guide in determining system links a large basin continue to include the diversion of water from river basin striped dissimilar basin of Huai Hong ngakhrai Centre by piping diameter length 7.44 meters, 0.30 km.• 1.2 Construction of the reservoir, so water retention in the activities of the study and development of various aspects of the current construction of the reservoir and then sink 3,312,500 capacity of 8 cubic meters.• 1.3 Spread the water around the system to support forest fire prevention by humidity and changes in the physical and ecological forests with forestry development zone in irrigation systems, 800 acres.• 1.4 Water delivery system include the construction of a water supply system to provide to area studies and development of agriculture, livestock, covering an area of approximately 1,150 acres.• 1.5 The work spread water-logged from moisture milions Creek Ridge, by establishing a system for linking by tubes and various small reservoirs, according to the current construction of the Ridge 8 sink capacity 3,312,500 m³.•1.6 งานชะลอความชุ่มชื้นตามลำห้วยธรรมชาติ โดยสร้างฝายต้นน้ำขนาดเล็กต่างๆ ซึ่งปัจจุบันได้ก่อสร้างแล้ว ทั้งในเขตพื้นที่พัฒนาป่าไม้ด้วยระบบชลประทานและในเขตพื้นที่พัฒนาป่าไม้ด้วยน้ำฝน รวม 304 แห่งและจากการศึกษาพบว่า การก่อสร้างฝายต้นน้ำ (Check Dam) เมื่อก่อสร้างแล้วเสร็จประมาณ 2 - 3 ปี จะสามารถเก็บกักน้ำได้ดี เหมือนสภาพฝายถาวร เนื่องจากเศษไม้และใบไม้ไปอุดบริเวณสันฝายทำให้เก็บน้ำได้ดี
การแปล กรุณารอสักครู่..
