The improvement of plant layout to increase productivity in the factory recycled plastic one
.The purpose of this research is to study the plant layout, and study the material flow of ำไป friend factory plant layout to improve old distance moving down and reduce production time
.The research steps include Study on the theory of the plant layout and the theory of the flow. To be adapted in the factory were studied in a case study, limited partnership
.A & M polymer group by studying production process and adjust the layout the new factory to suit the flow of the process. The results showed that the plant layout recommendations can reduce the distance moved from the original 56.5 meters left 44.8 meters think is decreased 79.3% when used to move materials from the original time 250 seconds per 1 sack, after the update only 157 seconds per 1 sack. Think of a time decreased 62.8% can reduce the time and distance in the production process and improve efficiency fully yield increased
.