Survey and summarize the points with the use of the drain of each plant.Conclusion the chimney to proceed in accordance with the law.Check the plan PM (does not leak. Not to leave without chimney).Plan solution.EHS.- a summary of the chimney to measure- pollutant measurement (dust, chemical) annual.
การแปล กรุณารอสักครู่..