As well. Provincial electricity authority of Pattaya to adjust by cutting distribution system, electric power station, North Pattaya, 2 chaiwongchon (new), and cut the trees, under high-voltage power line. Pattaya-naklua road (naklua SOI 12), t. p. pump. Naklua Wastewater treatment ponds to canals and persimmon SOI naklua 12 all. In operation it is necessary to abstain from power for the safety of the worker. Provincial Electricity Authority's power to temporarily abstain from Monday at 10.00 16.00 p.m. January 25 2559 times – if the worker completes the electrical power as it immediately.
การแปล กรุณารอสักครู่..
