At 9.00 am, contractors began to smash the phaenkrabueang until the mounting screw frame have dropped down with the weight of the tiles make it pull the scab comes down along the frame.
At 9:00 am, the contractor began smashing tiles. The fixing frame has broken down. With the weight of the tiles makes pulling down along the ceiling frame.
Time 9.00 a.m. contractors started pounding on tiles. Until the screw anchor frame has broken down. With the weight of the tiles to pull down along the ceiling structure