. The purpose of the inspection of buildingsThe owner of the building, the questions are often wondering shall benefit from a building inspection. Law enforcement than necessary? Must consider the legislation? The concept and objective of the law before.Because the building is the structure and internal systems related to the safety of the public, such as fire prevention and suspension system. Electrical systems, elevators, etc., to which these systems. When one phase is used to require inspection and maintenance. So that is in use at any time, in which the use of the building is properly and safely. Although the law will not be forced to perform inspection and maintenance, but it is the owner of the building should be carried out.There are many cases where this happens, building collapse or fire, especially public buildings with a large number of people living into. Despite the result, which indicates that the structure of the building has been in ruins and are a serious hazard, building collapse, if not resolved, but the owner of the building was not unexpected and that what will happen if a serious fire or some hotels that have a large number of people died. Even if the fire alarm system was installed, but when a fire. The system does not work, users could be careful building and not escape. Has emphasized the importance of monitoring the condition of the building systems.Currently there are several buildings that take into consideration the security of the lives and property of the people who use the building, by the maintenance of the structure and system of the building, in good condition is always already exists. Nevertheless, the inspection of buildings, it is also necessary, because it is a system of review, the error from the maintenance of buildings by the Auditor, which is a third party or a Third party.2. the role of the law on control of the building.The law has been given to the owner of the building must be provided with engineering or building inspectors who verify the architecture, but the case must examine the following:(1) stability, strength building, including:(A) to enhance, modify, improve the building.(B) change the weight on the building.(C) to change the conditions of use of the building.(D) Changes to the building, decoration materials, construction materials, or.(E) minor wear of buildings.(F) the Apocalypse of the building structure.(SSH) The groundwater Foundation building.(2) the components of building systems and equipment, namely:(A) facilities and service systems.(1) the elevator system.(2) the escalator system.(3) electrical system.(4) air conditioning system(B) the hygiene and environmental systems.(1) water supply system.(2) drainage system for waste and wastewater treatment systems.(3) the drainage system for rain(4) the waste management system.(5) ventilation system.(6) air pollution control and sound systems.(C) fire prevention and suspension system.(1) a fire escape and fire escape(2) fire exit signs and emergency(3) ventilation system to control the spread of smoke and smoke.(4) an emergency backup power systems.(5) fire elevator system.(6) informing the fire alarm system.(7) the extinguisher system installed.(8) fire protection systems, yanam Fire pump and sprinklerThe automatic fire fighting systems (9)(10) the lightning protection system.(3) the performance of the system and equipment of buildings namely building to evacuation the user.(A) performance and fire escape stairs(B) the performance check and exit signs, emergency lighting.(C) fire alarm notification system performance(4) a safety management system in the building:(A) fire protection plan and hold in the building.(B) the planned evacuation of users, building a practice.(C) management of the security plan in the building.(D) Management plan of building inspection3. type the desired building inspection and the audit report must be sent.The buildings there are 9 types.3.1 high building (the building where people could visit or living with three meters of height from twenty or more. Measure the height of the building, from the ground level to the roof surface construction. For the hip to measure draw or building from the ground level to the wall construction of the highest class).3.2 building size, no electricity (building construction intended to use the building or part of a building as a residential or business category or multiple categories, with the total area of all floors in one or more of the same after a thousand square metres)3.3 Assembly building (a building or part of a building where people can go inside for the sake of the people who have been gathering thousands of square meters, or rally from five hundred or more people).3.4 marasop (factory buildings, or any portion of a building that is used as a cinema. Theater Music or any other festive and aims to open public access show, it is a normal business, with or without compensation).3.5 good legislation with a number of rooms more than eighty rooms.3.6 condo condominium law-based or residential building (a building or part of a building that was used as housing for many families. By divided into separate units for each family), from the 2000 square meters of space or more.For Condo and residential buildings including the high building or not building a huge extra will be subject to delay scheduled checks is.– If there is an area in the same building together after no more than 5000 square meters, monitoring and verification, before October 25, 2012.– If there is a space in the same building together in 5,000 sq.m., checked and verified before October 25, 2010.3.7 factory building at higher floor and 1 from 5,000 sq m and up.15 meters high from the label 3.8 up to 50 square meters of space or more, or a label affixed or set on a tin or tile roof of the building, with an area ranging from 25 square metres or more.3.9 the service according to the law around the area from around 200 square metres or more.This is a category for both building 9 (unless the building according to the 3.6 not disruption, building size, building height.
การแปล กรุณารอสักครู่..