CMS Show (51) 750 V DC Line Voltage and SCADA display CUL-RAM, SB Delay trip and System failure temporal Re-closed back to normal check train TN041021 VN04 of RAM, SB, and serves as usual, at 08. : 48 pm. Approved TN01 VN07 Inspection Train from CUL-RAM, SB, as usual, at 09:31. BAN, SB TN190992 VN10 serving as TN041221 the VN04, 09:35. BAN, NB Detrain VN04 recycled Depot. Outside the park schedule T18 MWS 10:50. PSY / Siemens audit found that the TSS MC05 CUL caused by Delay Trip readability 48 Amp / ms. (standard = 45 Amp / ms), which perform the function devices. normal And wait for the results of the review of the train again
at 15:02 hrs. RST report FFO VN04 case of Delay trip inspection Fuse 750 VDC Terminal box and could not find anything wrong.
การแปล กรุณารอสักครู่..