1 there is a problem with the temperature of the Mold hit a Gate Valve is not working and there are problems with injection resin namai out. Make a mold 2 walk productions. But the mold can travel 2 productions simultaneously on both sides.Because there is a problem in hue. Zone A area to walk to each side of the production. Make the Kosu according to Std.
การแปล กรุณารอสักครู่..
