Construction of the operational plan is being used. When applied to a construction that resembles a construction is repeated. It causes inconsistency between construction operations plan and the actual task which would cause various problems, such as use of machinery and workers. Instability continued to work, etc.
การแปล กรุณารอสักครู่..