Where appropriate, studies and preliminary design of railway line. Victory square-phami-at-Nong Bua lamphu-Nong Bua lamphu phetchabun-Narayana or the beam consultants have calculated values for construction engineering of appropriate selection approach is that approaches 1 (purple) It is worth the initial civil engineering construction is equal to 92 million, this table: 427.22.
การแปล กรุณารอสักครู่..
