Refer to job RC0848/15/RC0821 15, and because the two BR branch through the shipping industry have filed through the checkpoint into the system according to the normal procedure to Test and get a Certificate from the Apr. 30 from branch to May 1, which permits export of rubber Research Institute staff on duty for only half a day early, to not be able to approve a through the checkpoint to the Assembly immediately to have a long weekend day 2-May 5, so the export clearance action cannot be carried out according to the original schedule. Which branch has the choice between filling the tires into the Cabinet. Therefore, it is necessary to apply all the deposits of heavy Cabinet placed at the Laem Chabang port area, private patio in waiting for approval through the checkpoint. That the owner is nathi wakes, on May 6, this part of the expenses occurred.
การแปล กรุณารอสักครู่..