1. planning and design of rehabilitation places removal 2. the introduction of machinery. The incoming device removal renovation in bulk for the first time, and. 3. modify format (Operate)
1. Planning and Design restoring disposal facility 2. The Machine. Equipment to improve the disposal of bulk in the first and 3 to modify the format operation (Operate).
1. Design and planning, restoration work place to get rid of.2. Adopting machinery. Improve the equipment in place to eliminate a bulk in the first.3 adjustment operation pattern (Operate).