1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4 saw machines must have a card (Guard) cables and other equipment used to test the environment. And other equipment intact. The sticker passed state from maintenance. And allow the use 3
.5 block area of operation, equipped with warning signs. And don't the irrelevant in the practice operation
3.6 equip PPE ที่มีมาตรฐาน prescribed (WI-SR-001)
3.7 install tray scrap parts from sawing and partition the office work
3.8 saws. Inspection of wood to the saw that there was no scrap metal. Or nails in the to the saw. If found to get out before the band saw
3.9 entering the workpiece to saw. The workpiece must be on the bed piece
3.10 don't press workpiece and the saw blade too much because it makes the motor damaged or workpiece flick out
3.11 while using noise or unusual sawing machine trembling. To stop the machine immediately. Because it is a danger signal that the saw blade is not balanced Or the motor overload is
3.12 before replacing saw blades every time, will turn the switch machine and pull the plug off
3.13. When not working or not in the area. To remove the plug sawing machine immediately
3.14 when sawing machine damage to stop. Return to the store and repair
3.15 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.
การแปล กรุณารอสักครู่..
