1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4 safety gout (Gouge), electrical equipment, and other devices, which used to have a complete picture. And other equipment intact. The sticker passed state from maintenance. And allow the use 3
.5 check various joints in Macau and the late late gas used in gout is in good condition, no การรั่ว absorbed with soap water before the Macau
3.6 placement of safety to Macau (Gouge) in the paddock, prepared or point put safety in Macau (Gouge) and installed at proper shelter sun - rain
3.7 block area of operation, equipped with warning signs. And don't the irrelevant in the work 3
.8 air compressor must have a card (Guard) cover the pivot point. The sticker passed state from แผนกซ่อมบำรุง and allow the use of
3.9 block area of operation, equipped with warning signs. And don't the irrelevant in the work
3.10 provided the watcher fire with fire extinguisher operation
3.11 wear PPE device with standard setting (WI-SR-001)
3.12 install partition sparks, tray, fall the fireball fireball at work. And prepare to leave the container scrap wire gout as regulations
3.The electric wires and cables 13 Macau and gas line used to order placed in a table or hang on hang ด้วยตะขอ S made to order
3.14 the working need no combustible or flammable. In the halo sparks flying to
3.15. Catch hold of the target to Macau to strengthen. Development and support pieces remaining
3.16 use blanket cover machinery and flammable objects in case may be sparks from Macau
3.17 on wind / gas line to use belt pipe. Do not use wire
3.18 banning the use of pressure gauge at the broken it
3.19 duct / pipe gas (AIR O2,,N2) must be in the set, or on the cart and to tie the rope. Or chain to together every time. And should not be set up near power lines. Oxygen pipe must not stained with oil or grease
3.20 container with flammable substances in Macau task within such as the fuel tank must be cleaned before. Be sure that there is no flammable vapors residues
3.21 work gout material or container that is toxic to the body such as lead metal galvanized must have a hood or wear air purifiers. Or to provide adequate ventilation. Because smoke from gout is harmful to health 3
.22 line to Macau must not stay in the water while working
3.23 case to Macau workpiece in is wet. Must wear safety shoes rubber soles. And find a dielectric material foundation, point the Macau
3.24 grounding installation cabinet to Macau to prevent short circuit
3.25. Gas pipe pressure when used all must take the empty change immediately. Don't leave the empty bucket in front of the 3
.26 when finished in Macau. Should stop gout every time. Switch off the electricity delivery discharge wire gas out of the joints and coil ready. Collect and store in หัวเชื่อม. Set
3.27 when Air Macau damaged to stop using. Return to the store and repair
3.28 arrange a ladder or scaffold in Macau workpiece on a higher 3
.29 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable. Will be meeting planned thoroughly with the Department Safety
.
การแปล กรุณารอสักครู่..
