The company has studied from exxonmobil operations processes in supply chain side of the company is to be used in the operation, which is the primary Integrated Oil & Gas (Upstream, Midstream, and since is Downstream).1. upstream (Upstream), The stage of the upstream production process involves searching for and extracting raw materials upstream part of the production. The process does not do anything with the material itself, such as processing the material first. the company will send engineers to the upstream sector.Exploration drilling for crude oil and natural gas drilling, survey, when the crude oil transportation, it will then proceed to the next step.2. develop and manage Midstream asset pipeline Equipment for transportation and storage tanks including crude oil, natural gas, petroleum products, from transport to use drilling source came to the Central refinery River associated with transportation (by boat, train, tube, oil tankers or trucks) the wholesale market of crude oil or refined petroleum products pipelines, and other transport systems that can be used from the production site to the extraction of crude oil in the various products and refining, downstream. Natural gas transmission pipeline network, including gas purification factory gas and sends it to the end customer. -Project engineer, which has contributed to the development team to plan and manage the utilization of property development area and fix technical issues associated with operating assets in operation. Project management scope involves pipe field and control terminals. -Participation in the planning and development of projects, coordinate and participate in a new design and fix what is needed to meet the requirements of the project. Coordination and supervision of contractors and other resources in the operations.-Reliability Engineer-management and is responsible for increasing the efficiency of the factory personnel and physical assets to make sure that the plant meets the objectives of global water. -Various location in the planning, planning, planning, material planning, production planning, scheduling, use and limited. The development of materials. The use of raw materials, production, packaging, and make a plan to achieve the target level of customer service. While the transport network and the restrictions on use and inventory levels throughout the network coordinator in a project management product line and operations coordinator on site. Office location-based factory locations3.Downstream
การแปล กรุณารอสักครู่..
