2.7.2 development plan transportation systems.1) master plan to develop a special Highway between the city (Highway Department) From the review of the master plan to develop a special Highway between the city (Highway Department) I found that in the eastern area, with related projects including the project path is linked to the East. A special Highway between the town of Chonburi-Pattaya Sai-map Ta phut (distance 89 KMS.), which is an important land transportation routes for the eastern coastal areas. The goal is to invest in one of the most important of the country. This route is the infrastructure that is necessary, both in terms of cargo transportation, tourism promotion and support to the development of Industrial Affairs. Pattaya Chonburi-interval and continuous range with special Highway between the town of Chonburi and Bangkok-chon buri-Pattaya-range current under construction update 6-8 channel traffic. As well as a new approach to construction Pattaya Chonburi ranges 4 traffic size-distance 51 miles currently updates expand the traffic is from 6-8 traffic and improves official control (Fully Controlled Access) in a special Highway between the city ...A substitute ngako parallel to the original so that people can use as an alternative to travel. Range Pattaya-map Ta phut is the new path. It is about 38 kilometers of highway construction is a new concept hotel. Size 4 channel traffic on the ground at a full-out entrance control by construction to sift and crossing, as appropriate, the special Highway. Pattaya Chonburi-range performing as shown special Highway between the town of Sai, Chonburi-Pattaya-map Ta phut in 2.7.2 image-1.
การแปล กรุณารอสักครู่..
