The Team Manager is the PC has a separate Item master in Astom to split order between the part that is used as Raw material and part through. , which the PO opened to the supplier, the description will be included at the end. name () as the project now. example (Z9) = Part through, (P1) = P / S Pump. , so the next time I team Purchase notify the Supplier to exclude Package by PO not be included in the box. Package only because of problems in the Incoming time job can not be split off to Import Stock of each production line immediately. , with respect Prayer Nat Mani palace.
การแปล กรุณารอสักครู่..
