Regarding the scale, design, install, and manage waste and waste residue. For the solar power operations from the photovaltaic panels technology are not exempt must obtain a license electrical business or declare Reed St.
The section of design, installation and management of garbage and waste. For operators of solar panel technology photovaltaic the exemption is not required to obtain a license for electricity or ERC announced.
On the design, installation and management of garbage and waste. Solar power panel for business technology photovaltaic exempt do not obtain a license or power announced. Kg B.