Power inverters, with 9 led bulbs 10 watt bulbs. By this project is an experimental performance of the battery power to the load by the way, is measuring the losses in the battery through the inverter while it is loading 10 tube lighting up the performance of the battery power to the load time of 19 hours, pouring.Yopkap power in battery 120 amp per hour. Each day the lighting load is powered by the battery, 10 hours per day can be seen that the average load on the use of light energy from batteries full time 1.9 days battery power will therefore establish working team has designed the system. Doiwongchon comparison of voltage charger serves as a switch in the circuit editing control, low battery, power transmission. To power to the load the load on some days.
การแปล กรุณารอสักครู่..
