Development of operation system has 4 steps: 1) and 2 data gathering system and analysis) system design and development, System testing, 3) by making Microsoft Visual C brought # used Microsoft SQL Server, 2008.
The system has four steps: 1) to study and collect data, 2) systems analysis. System design and 3) development and testing. Be embraced by the Microsoft Visual C # using the Microsoft SQL Server 2008, programming and managing the database.
The system has 4 steps 1) to study and collect information 2) system analysis, design and development and testing system 3) system The author took the Microsoft Visual C # to programming and the use of Microsoft SQL Server 2008