The Design Tables,Production Line Tooling Production process and the preparation of production line design lines from the table using the production function, the city of the production line, the most effective control of Input/Output WIP and easy-to-follow pre-determined target is.Each Process with conveyer belts (Belt conveyor) by placing a hunchback and a work desk work desk is designed to be consistent with the work by standing up to the movement (Motion).The length and the height of the right to work is designed to be the most flexible to work quickly in accordance with the design standards specified time table will use ConceptAnd the standard of the work, it will be designed to be suitable for their work to provide maximum performance. The design Conveyor Bolt Belt will be able to control the speed.the manufacturing process the manufacturing process is a new concept, designed by the update from defects, for maximum efficiency and mind free from dust and a main ESD Line SMT (Surface Mount Technology).The City, using the machine's CASIO,but the new PANASONIC Set up by new machinery that is more efficient to produce to increase the productivity of both YAMAHA Screen printing,Chip Mounter Solder Koh Young Reflow inspection of the oven is a Heller Input to convey from Output is a belt loop back to pieces to check 100% before delivery to the movement of the next production line has 5 lines for all the production is 700 K/month and have the applianceTo make sure the quality of Solder LSI BGA type COB will focus on in the process, with high-performance, it will reduce the work-in-use Manual Auto More from the process to C - MOS Musashi, we have used the new and there is a designThe writing program that fit more Jig design format that can be shared and support C - MOS setting M/C and Sealing M/C Jig design to reduce the problem. There are several forms and the Bonding. adjust the height, before the order.The work that the COB Sealing, there is a higher than the cut-off, we have been able to do the COB romm before sending check function, it must be a Function Laser PCB mark prior to the process of production and the number of lines in the 3.Support production lines 5 lines 800K/month in the process PCB Ass'y to ensure successful production lines are available for a transfer Belt PCB Digital-speed control is designed to work as a table stand is made for a number of western Leinster table of table 8and there is the place of the table Layout work to be the same as standard process to production efficiency and supports the production of a more production lines with the amount allocated by the production line structure and is divided into production in accordance with the importance of the work such as Low end model,writing Data model, Bluetooth model and a separate line on the curb, a Hetero out separately in the calculation of production is divided into 300 K, 500 K and 700 K and then provide equipment production line to work to achieve the goals set by a process Standard Tack Time about 0.32 min output/Line 1.7/Line/day and the number of lines in the production line support 10 1000 K/Month Line Case ass'y, Line Watch ass'y,Line Lowend Conveyor has developed from its original belt put on the table of our work is plain with a flush on the table, always with desk level to the work of the order, and very beautiful.To ensure the maximum comfort grip on the work and reduce the strain of employees. Line Band ass'y is updated as follows: Conveyor belt has been developed from the previous work of employees put it down on the table in plain flush on the table.for a tidy and very nice work desk more developed from the production of Zeolites have been sitting in a stand-up and there is a wide area, on one count of the table add 10 cm.Casio Korat will be divided into a Case ass'y is divided into Line Analog = 10 lines,Each Line 7 people, Tacttime=0.33 MIN, Cap/day = 1.3 K/day (OT = 1.6 K/day divided into Line Digital = 7 lines, each Line 9 people, Tacttime=0.33 Min, Cap/day = 1.3 K/day (OT = 1.6 K/day) Divided into Line Digital = 3 lines, each Line 11 people, Tact time = 0.43 min, Cap/day = 1.0 K/day (OT = 1.25 K/day) Module & Watch ass'Line Analog = 14 lines on the theme is divided into Line Analog for Model QX - SU 4 = 4 lines, each Line 21 people, Tacttime=0.31 Min, Cap/day = 1.5 K/Da (OT = 1.8 K/day) Divided into 2 Hand Model Line Analog for = 6 lines, each Line 18 people, Tacttime=0.37 MIN, Cap/day = 1.2 K/day (OT = 1.5 K/day),For Model Line Analog is divided into 5 Motor = 4 lines, each Line 18 people, Tacttime=1.20 MIN, Cap/day = 0.4 K/day (OT = 0.5 K/day) Line Digital = 10 lines on the theme is divided into Line Analog for Model QX - SU 4 = 4 lines, each Line 21 people, Tacttime=0.33 Min, Cap/day = 1.35 K/day (OT = 1.6 K/day) area Inspection Air leak proof Water Aging Compass Hetero Magnetic Anti Magnetic insp has developed the position of M/C each station, there is a sequence of steps of the work flow, and more convenient than a Casio Out line area, Vatican CityThere will be no Casio, Nakhon Lightcraft, operating staff will be using the work area of Lightcraft Band prior to integration. Therefore, the new model will be updated with the details, and then there is Out Analog line used for all tables are divided into 16 groups, check all.The group of 4 people who use Digital Out line for all tables are divided into 12 groups of 4 check all groups, each of 3 Band ass'y a number of lines all lines 12 for both Model Digital & Analog Line is divided into 6 people,Tacttime=0.20 MIN, Cap/day = 2.3 K/day (OT K = 2.8 /day), Packing ass'y Line Total = 7 lines including Digital & Analog Line is divided into 7 different people, Tacttime=0.13 Min, Cap/day = 3.5 K/day (OT = 4.3 K/day) Lowend ass'y a number of lines 4 lines are all Model Lowend Line is divided into a total of 14, Tacttime=0.14 Min, Cap/day = 3.0 K/day (OT = 3.5 K/day).
การแปล กรุณารอสักครู่..
